Bulk edit Procore change event titles with an Excel formula

Have you ever migrated three hundred change events into Procore and then opened every one to delete the old system’s prefix from its title?

Strip a migration prefix, or fix any pattern, across every change event title at once. One formula in a helper column, paste values, and sync.

Quick answer

To bulk edit change event titles in Procore, open the Sandspit extension in Excel and use Edit Change Events to pull the project. In a helper column, write one formula that cleans the title, such as SUBSTITUTE to strip a prefix, and fill it down. Paste values over the Title column, review the changes, and sync.

01

Pull the change events into Excel

Open the Sandspit extension in Excel, choose Edit Change Events, and click Pull from Procore. The Change Event Headers sheet has one row per change event, with Title as an editable column.

02

Write the clean title in a helper column

In an empty column to the right of the table, write one formula that cleans the title, for example =TRIM(SUBSTITUTE(G2,"MIGRATED - ","")) to strip a migration prefix, and fill it down. Check the results before anything touches the titles.

Note: columns to the right of the table are kept when you pull again, so the helper column can stay until you are done.

03

Paste values over the titles

Copy the helper column and paste values onto the Title column. Each title that changed is highlighted, and the pane lists every change event with the title it had and the title it will get.

Note: paste values, not the formula. Sandspit syncs what is in the cell, and the formula would point at the title it is replacing.

04

Review the changes

Only titles that actually changed are listed. A title the formula left as it was is not a change, so it is not sent. A blank title is flagged before sync with a button to restore the pulled one.

05

Sync

Click Sync. Each change event is updated in Procore, the pane marks it Updated, and the sheet shows Synced.

Why titles end up messy

Change events moved over from another system often keep that system’s prefix or numbering in the title. Fixing them in Procore means opening each change event and editing the title by hand, which for a few hundred change events is a day of clicking.

What changes in Excel

  • One formula. The fix is written once and filled down every title.
  • Checked before it’s sent. The clean titles sit in their own column until you paste.
  • Only changes sync. Titles that were already clean are left alone.

Frequently asked

How do I bulk edit change event titles in Procore?

Pull the change events into Excel with Edit Change Events, change the Title column, by formula or by hand, and sync. Every change event you edited is updated in one pass.

What if the prefix isn’t the same on every title?

Cut everything up to a separator instead. For titles like EB-0412 - Paint upgrade, use =IFERROR(TRIM(MID(G2,FIND(" - ",G2)+3,255)),G2). Titles without the separator come back unchanged, so they are not listed as changes.

Can I use Find and Replace instead?

Yes, for one exact prefix. Select the Title column and replace it with nothing. The formula is safer when the text varies, because you can check every result in the helper column before you paste.

Why paste values instead of typing the formula into the Title column?

Sandspit syncs what is in the cell, and a formula in the Title column would refer to the title it is replacing. Keeping the formula in a helper column and pasting values sends only the clean text.

Can I add a prefix instead of removing one?

Yes. Any formula works, for example ="L4 - "&G2 to add a level to every title. Paste values over the titles the same way and sync.

What permission do I need?

Standard or Admin on the project’s Change Events tool.

Applies to

Procore Project Financials. Needs Standard or Admin on the Change Events tool. One project per workbook.

Step-by-step mechanics, every column, and every error message are in the documentation.